How to wire a fog cannon?

DATE:2024-09-11 17:22:14

Views:

管理员

Instagram Email Facebook Twitter

How to wire a fog cannon?



The wiring of the fog cannon is an important process involving electrical safety, equipment performance and operational effectiveness. Only by completing the wiring correctly and in a standardized manner can we ensure the normal operation of the fog cannon and the effect of environmental management. The following Zheng Tong fog cannon manufacturers will take you to understand the operating steps of the fog cannon wiring.

666.jpg

1. Safety preparation

Disconnect the power supply: before any wiring operation, must ensure that the power supply has been completely cut off to ensure the safety of construction personnel.

Confirmation of power status: Before starting wiring, use special tools to detect whether the power supply is off to avoid electric shock accidents.

2. Select cables and plugs

Voltage requirements: according to the voltage requirements of the fog cannon, select the appropriate specifications of the cable and plug to ensure that the cable can meet the power load requirements.

Wire specification: Select the wire specification and type that meets the current transmission requirements and has enough safety coefficient to guarantee the stable transmission of current.

3. Connecting the power connector

Insert the power connector: Insert one end of the selected cable into the power connector of the device, make sure the plug matches the socket and is firmly connected.

Connect the power terminal: the other end of the cable needs to be connected to the corresponding terminal of the power supply, to ensure that the connection is correct and tight.

742367a9ce0c7d8f05f8342273010924 拷贝 5.png

4. Connect the motor

Corresponding to U, V, W phase: the motor of the fog cannon usually has three contacts U, V, W, they should correspond to the corresponding interface points of the three-phase power supply, and ensure that the color and direction are the same.

5. Check wiring

Wiring check: After completing all wiring, wiring check should be carried out to ensure that all wiring is correct and connected firmly and reliably.

6.Installation of control cable

Controller interface: connect the controller interface of the fog cannon with the control cable interface of the machine, and then connect the control cable to the controller.

7. Set overload protection

Connect the relay: connect the control interface of the overload protection relay of the fog cannon to the controller, and set the appropriate overload current alarm value to prevent the machine from overload operation.

8.Test check

Multimeter test: use a multimeter to check whether the voltage of each phase line is balanced, if it is unbalanced, you need to check and repair the line problem in time.

Circuit breaker status: make sure that all circuit breakers are in ON position for the equipment to work normally.

742367a9ce0c7d8f05f8342273010924 拷贝 4.png

In summary, in practice, should also take into account the application scenarios and environmental conditions of the fog cannon, choose the appropriate wiring materials and protective measures, regular inspection and maintenance to extend the service life of the fog cannon and maintain its good working condition.